1
/
of
13
WELLFOR
WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors
WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors
Regular price
$1,289.99 USD
Regular price
Sale price
$1,289.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Product Dimension - This set includes three mirrored cabinets — two 24"x36" and one 16"x36" — combining into a spacious 64"x36" wall-mounted unit. Wall-mount dimensions: W 64" × H 36" × D 4.81". Recessed dimensions: W 63.5" × H 35.5" × D 3.81".
- Anodized Chrome Aluminum - Crafted from premium anodized chrome aluminum, this bathroom medicine cabinet offers a sleek look with superior rust resistance and long-term durability.
- Blum Soft-Close Hinges - Equipped with premium Blum hinges, the soft-close door design eliminates noise and ensures a smooth, quiet closing experience, while also enhancing the overall longevity and reliability of the cabinet.
- 180° Reversible Door Installation - Designed with a 180° reversible mirror door, this mirror cabinet allows left or right opening for flexible installation and personalized convenience.
- Adjustable Glass Shelves - Includes 9 ultra-clear adjustable glass shelves (8mm each), each supporting up to 35 lbs. Customize the height to fit your needs and keep your bathroom essentials perfectly organized.
- Tri-View Glass Mirrors - With tri-view glass mirrors, this aluminum medicine cabinet offers a panoramic view that simplifies your grooming routine, giving you the perfect angle for shaving, makeup, or hairstyling with ease.
- Surface or Recessed Mount - This medicine cabinet supports wall-mounted or recessed installation and includes a surface mount kit for convenience.
- Easy Installation - This mirror cabinet is shipped in THREE packages and requires simple assembly. All necessary hardware and a clear installation manual are included in the package, making the setup quick and hassle-free.
Overview
- Brand : WELLFOR
- Color : Chrome Aluminum
- Material : Aluminum
- Product Dimensions : 4.81"D x 64"W x 36"H
- Special Feature : Adjustable glass shelves+Soft-close door+Reverisble Installation+Surface or Recessed Mount
Share
